HYGIENE DISPOSABLE MACHINE

Construction Process Record(Sanitary Napkin Line)

HYGIENE DISPOSABLE MACHINE

Construction Process Record(Sanitary Napkin Line)
1st Week Assembly
Frame (After CNC treatment)
2nd Week Assembly
Frame Frontal (Operating side)
Rear (Driven side)
3rd Week Assembly
Turning Unit
Rotary Moduels
Rear Driven Parts –Timing wheels
4th Week Assembly
Main Rotary Modules
 Electric Cabins 
Rear Driven - Air Pipes
5th Week Assembly
Forming Section (Frontal)
Off-line Device
Turning Drum & Sucking plates
Embossing unit with security device
Forming vacuum (Rear)
Electric cabins with wires
6th Week Assembly(POWER ON, EMPTY TRIAL)
Forming section (Completed)
 Module with Heating Cover for safety operation
 HMI Touch Screen
Rear Security Doors
Rear side (All blowing pipes & Wires, Electric driven system)
Entire completed
7th week – Test On & High Speed Trial run
All Raw feed-in, with Modules work
High speed Trial , 1000-1200pcs\min
Upper Floor – Glue units
Waste bin